December 10, 1999: The electrical service was
upgraded to 200 amp which required the installation of a new power cable from the pole at
the south property line to the house.
Unfortunately, the poor trees took a real beating and
the elm in the upper photo is probably not going to survive.
Westphal Electrical Contracting did the job.
They had a rough time with it because their trencher (lower photo left) broke down and it
was a couple more days before they could bring in a backhoe to finish.
After the electricians ran the cable, it was time for
the power company to install a new power pole and transformer.
|